Cleanroom Testing & Commissioning
Once an installation is complete our project team will then carry out of the testing, commissioning, and validation of a facility to ensure it is compliant with cGMP & ISO 14644, we believe it is essential for a Cleanroom contractor to carry out these works and give a client proof that the new or refurbished facility meets with all regulatory standards and a clients VMP before handing over a project.
When required the validation of the cleanroom will start with design and follow through to final handover and performance testing working through the qualification protocols that provide the formal acceptance criteria of DQ, IQ & OQ, our in house team work with our clients to support each of these important steps.
Using calibrated equipment
Asgard Controlled Environments can perform:
- HEPA Filter installation leak tests
- Airborne particle counts to ISO 14644
- Room pressure measurements
- Airflow balances
- Recovery performance
- Noise and lighting levels
- Air flow visualisation
- Air flow and air change rates
- KI containment testing